Technical Analysis for IBG - Ironbark Zinc Limited
ADX | Long Term | Intermediate Term | Short Term |
---|---|---|---|
Weak or Absent | Down | Down | Down |
Date | Alert Name | Type | % Chg |
---|---|---|---|
20 DMA Resistance | Bearish | 0.00% | |
50 DMA Resistance | Bearish | 0.00% | |
Expansion Breakdown | Bearish Swing Setup | 0.00% | |
Expansion Pivot Sell Setup | Bearish Swing Setup | 0.00% | |
Reversal New Lows Setup | Bearish Swing Setup | 0.00% | |
MACD Bullish Signal Line Cross | Bullish | 0.00% | |
Wide Bands | Range Expansion | 0.00% | |
Gapped Up | Strength | 0.00% | |
Below Lower BB | Weakness | 0.00% | |
Lower Bollinger Band Touch | Weakness | 0.00% |
Alert | Time |
---|---|
Possible Pocket Pivot | 2 days ago |
Up 10% | 2 days ago |
Rose Above 50 DMA | 2 days ago |
Rose Above 20 DMA | 2 days ago |
Rose Above 10 DMA | 2 days ago |
Get a Trading Assistant
Ironbark Zinc Limited Description
Ironbark Zinc Limited is an Australia-based company engaged in the exploration and evaluation of its zinc and gold ground holdings. The Company's segments include Australia and Greenland. The Company mineral assets in Australia include over two base and precious metal projects in New South Wales (NSW). Its Australian projects include Captains Flat, Fiery Creek and Fiery Creek North. The Company's Greenland projects Citronen, Mestersvig and Washington Land. The Citronen Zinc-Lead Project is located in northern Greenland. The Mestersvig Base Metal Project in eastern Greenland includes over three exploration licenses, which contain the Blyklippen Zinc-Lead Mine and the outcropping Sortebjerg Zinc-Lead Prospect. The Washington Land Project in North West Greenland contains the Cass Fjord base and precious metals prospect. The Captains Flat Project contains the Lake George Mine and together with the adjoining Peakview project, which contains several base and precious metal prospects.
Classification
Sector: Basic Materials
Industry: Gold
Keywords: Exploration Gold Chemistry Metal Metals Iron Base Metal Zinc Precious Metal Precious Metals Base Metal Project Chemical Substances Washington Greenland Precious Metal Projects Joining
Indicator | Bull Case | Neutral / Hold | Bear Case |
---|---|---|---|
50 DMA | |||
200 DMA | |||
ADX Trend | |||
Oversold / Overbought | |||
Relative Strength |
Indicator | Value |
---|---|
52 Week High | 0.012 |
52 Week Low | 0.004 |
Average Volume | 1,263,079 |
200-Day Moving Average | 0.007 |
50-Day Moving Average | 0.005 |
20-Day Moving Average | 0.005 |
10-Day Moving Average | 0.005 |
Average True Range | 0.001 |
RSI (14) | 48.72 |
ADX | 23.6 |
+DI | 37.778 |
-DI | 37.778 |
Chandelier Exit (Long, 3 ATRs) | 0.004 |
Chandelier Exit (Short, 3 ATRs) | 0.006 |
Upper Bollinger Bands | 0.006 |
Lower Bollinger Band | 0.004 |
Percent B (%b) | -0.06 |
BandWidth | 32.653 |
MACD Line | 0.000 |
MACD Signal Line | 0.000 |
MACD Histogram | 0.0 |
Pivot Point Level | Traditional / Classic | Fibonacci | Demark | Woodie | Camarilla |
---|---|---|---|---|---|
Resistance 4 (R4) | 0.006 | ||||
Resistance 3 (R3) | 0.006 | 0.005 | 0.005 | ||
Resistance 2 (R2) | 0.005 | 0.005 | 0.005 | 0.005 | |
Resistance 1 (R1) | 0.005 | 0.005 | 0.005 | 0.005 | 0.005 |
Pivot Point | 0.004 | 0.004 | 0.004 | 0.004 | 0.004 |
Support 1 (S1) | 0.004 | 0.004 | 0.004 | 0.004 | 0.003 |
Support 2 (S2) | 0.003 | 0.004 | 0.003 | 0.003 | |
Support 3 (S3) | 0.003 | 0.003 | 0.003 | ||
Support 4 (S4) | 0.003 |