Technical Analysis for TTM - Titan Minerals Ltd  

Grade Last Price % Change Price Change
D 0.026 -3.70% -0.001
TTM closed down 3.7 percent on Thursday, May 9, 2024, on 34 percent of normal volume. Note that the stock is in oversold territory based on its Slow Stochastic indicator (14, 3, 3) -- so don't be surprised if it goes sideways or bounces.
Earnings due: May 29
*** please verify all earnings dates ***
1 Watcher
Watchlist Portfolio

Trend Table & Recent EOD Trading Signals

ADX Long Term Intermediate Term Short Term
Weak or Absent Down Down Down

Date Alert Name Type % Chg
Wide Bands Range Expansion 0.00%
Lower Bollinger Band Touch Weakness 0.00%
Oversold Stochastic Weakness 0.00%
MACD Bearish Centerline Cross Bearish -3.70%
Narrow Range Bar Range Contraction -3.70%
Inside Day Range Contraction -3.70%
Wide Bands Range Expansion -3.70%
Oversold Stochastic Weakness -3.70%
Fell Below 50 DMA Bearish -3.70%
Expansion Pivot Sell Setup Bearish Swing Setup -3.70%

   Recent Intraday Alerts

Alert Time
Down 1 ATR about 15 hours ago
Down 5% about 15 hours ago
Fell Below Previous Day's Low about 17 hours ago
Down 3% about 17 hours ago
Down 2% about 17 hours ago

Get a Trading Sidekick!

Let us help you stay on top of your investments. We will alert you to important technical developments on your portfolio & watchlist.

Profile

Titan Minerals Ltd   Description

Titan Minerals Limited, formerly Minera Gold Limited, is an Australia-based international mining and processing company with operations in Peru. The principal activity of the Company is the ownership and operating a gold and copper toll processing plant in the Nazca Ocona region in southern Peru includes the ownership of copper and gold exploration concessions and development and production of medium sized gold projects in South America, with a primary focus on Peru. Torrecillas Gold Project is a development project located 640 kilometer south of Lima in south-eastern Peru within the Nazca-Ocona geological belt, a mining region, which hosts operating gold mines. Tumi project includes gold, silver and copper mineralization. Engenho Gold Project is located in the State of Minas Gerais and includes known deposits and exploration targets, including Crista, Olhos and Mazorca in addition to the Engenho underground mine. Olhos is located 900 meter north of Engenho, 600 meter south of Crista.


Classification

Sector: Basic Materials
Industry: Gold
Keywords: Exploration Mining Gold Copper Minerals Silver Mines Gold Mine Mineralization Occupational Safety And Health Gold Mines Minas Gerais

Is TTM a Buy, Sell or Hold?

Indicator Bull Case Neutral / Hold Bear Case
50 DMA
200 DMA
ADX Trend
Oversold / Overbought
Relative Strength

Indicators

Indicator Value
52 Week High 0.077
52 Week Low 0.017
Average Volume 3,861,599
200-Day Moving Average 0.035
50-Day Moving Average 0.028
20-Day Moving Average 0.030
10-Day Moving Average 0.029
Average True Range 0.002
RSI (14) 47.37
ADX 20.52
+DI 22.835
-DI 36.614
Chandelier Exit (Long, 3 ATRs) 0.031
Chandelier Exit (Short, 3 ATRs) 0.030
Upper Bollinger Bands 0.034
Lower Bollinger Band 0.025
Percent B (%b) 0.11
BandWidth 31.650
MACD Line 0.000
MACD Signal Line 0.000
MACD Histogram -0.0006
Fundamentals Value
Market Cap 28.99 Million
Num Shares 1.12 Billion
EPS -0.05
Price-to-Earnings (P/E) Ratio -0.49
Price-to-Sales 3.91
Price-to-Book 12.07
Pivot Point Level Traditional / Classic Fibonacci Demark Woodie Camarilla
Resistance 4 (R4) 0.029
Resistance 3 (R3) 0.029 0.028 0.029
Resistance 2 (R2) 0.028 0.027 0.028 0.028
Resistance 1 (R1) 0.027 0.027 0.027 0.027 0.028
Pivot Point 0.026 0.026 0.026 0.026 0.026
Support 1 (S1) 0.025 0.025 0.025 0.025 0.024
Support 2 (S2) 0.024 0.025 0.024 0.024
Support 3 (S3) 0.023 0.024 0.024
Support 4 (S4) 0.023