Technical Analysis for WKT - Walkabout Resources Ltd  

Grade Last Price % Change Price Change
D 0.110 -4.35% -0.005
WKT closed down 4.35 percent on Wednesday, April 24, 2024, on 1.57 times normal volume. Note that the stock is in oversold territory based on its Slow Stochastic indicator (14, 3, 3) -- so don't be surprised if it goes sideways or bounces.
2 Watchers
Watchlist Portfolio

Trend Table & Recent EOD Trading Signals

ADX Long Term Intermediate Term Short Term
Weak or Absent Down Down Down

Date Alert Name Type % Chg
Stochastic Reached Oversold Weakness 0.00%
Oversold Stochastic Weakness 0.00%
Non-ADX 1,2,3,4 Bearish Bearish Swing Setup -4.35%
Volume Surge Other -4.35%
Narrow Range Bar Range Contraction -4.35%
Inside Day Range Contraction -4.35%
Oversold Stochastic Weakness -4.35%
20 DMA Resistance Bearish -4.35%
50 DMA Resistance Bearish -4.35%
Non-ADX 1,2,3,4 Bearish Bearish Swing Setup -4.35%

   Recent Intraday Alerts

Alert Time
10 DMA Resistance about 9 hours ago
Reversed from Down about 13 hours ago
Down 1 ATR about 13 hours ago
3x Volume Pace about 13 hours ago
2x Volume Pace about 13 hours ago

Get this analysis on your stocks daily!

Let us help you stay on top of your investments. We will alert you to important technical developments on your portfolio & watchlist.

Profile

Walkabout Resources Ltd   Description

Walkabout Resources Limited is an Australia-based mineral exploration company. The Company is principally engaged in the exploration and development of resources and energy assets located in Botswana, Tanzania and Namibia. The Company's operating segments include Graphite, Coal, Lithium and Copper. The Company's geographical segments include Australia, Botswana and Tanzania and Namibia. The Company's projects include Takatokwane Coal Project, Lindi Jumbo Graphite Project and Kigoma Copper Project. The Takatokwane Coal Project is located approximately 195 kilometers from the Botswana capital, Gaborone, in the southern belt of the Central Kalahari Sub-Basin. The Lindi Jumbo Graphite Project is located within the emerging graphite province in southeastern Tanzania approximately 200 kilometers by road from the port of Mtwara. The Kigoma Copper Project is located approximately 80 kilometers south of the town of Kigoma on the shores of Lake Tanganyika in western Tanzania.


Classification

Sector: Basic Materials
Industry: Industrial Metals & Minerals
Keywords: Exploration Chemistry Copper Energy Mineral Exploration Chemical Elements Lithium Coal Carbon Graphite Namibia Boron Tanga Goma Jumbo Mtwara Port Of Mtwara Energy Assets

Is WKT a Buy, Sell or Hold?

Indicator Bull Case Neutral / Hold Bear Case
50 DMA
200 DMA
ADX Trend
Oversold / Overbought
Relative Strength

Indicators

Indicator Value
52 Week High 0.1725
52 Week Low 0.094
Average Volume 378,412
200-Day Moving Average 0.123
50-Day Moving Average 0.118
20-Day Moving Average 0.119
10-Day Moving Average 0.115
Average True Range 0.005
RSI (14) 44.13
ADX 11.57
+DI 30.263
-DI 32.895
Chandelier Exit (Long, 3 ATRs) 0.115
Chandelier Exit (Short, 3 ATRs) 0.125
Upper Bollinger Bands 0.132
Lower Bollinger Band 0.106
Percent B (%b) 0.15
BandWidth 21.961
MACD Line -0.002
MACD Signal Line -0.001
MACD Histogram -0.0009
Fundamentals Value
Market Cap 38.4 Million
Num Shares 349 Million
EPS -0.01
Price-to-Earnings (P/E) Ratio -12.22
Price-to-Sales 0.00
Price-to-Book 2.23
PEG Ratio 0.00
Pivot Point Level Traditional / Classic Fibonacci Demark Woodie Camarilla
Resistance 4 (R4) 0.118
Resistance 3 (R3) 0.118 0.117 0.116
Resistance 2 (R2) 0.117 0.115 0.116 0.116
Resistance 1 (R1) 0.113 0.114 0.113 0.113 0.115
Pivot Point 0.112 0.112 0.111 0.111 0.112
Support 1 (S1) 0.108 0.110 0.108 0.108 0.105
Support 2 (S2) 0.107 0.109 0.106 0.104
Support 3 (S3) 0.103 0.107 0.104
Support 4 (S4) 0.103